Balusters

Top and bottom, you get them delivered by a further 1o cm to facilitate the assembly and to cut to the right length.

Have you chosen a railing height 700 mm delivered the words with a length of 900 mm.

You screw/glue the ribs between the upper and lower ledger

Gable Decorations


At the top, you get them delivered by a further 1o cm (or optional) to facilitate the assembly and to cut to the right width.

Gable Decorations are often fastened behind the lower barge board with screws through the front and into the Gable Decoration.

Running Trims


At the top, you get them delivered by a further 1o cm (or optional) to facilitate the assembly and to cut to the right width.

Running Trims are often fastened behind the lower barge board with screws through the front and into the Running Trim.

Brackets

Consoles can be mounted in different ways, but usually in combination with glue and a screw in each "tip" (In this example, 1 screw top right and bottom)